Solarfy Blog/22 November 2026
Solar Panel Removal and Reinstall for a Reroof
Roofs outlast most things on a house, but not forever. If your tiles are cracking, your Colorbond is chalking, or you're adding a second storey, you may need to take the solar array off and put it back on afterwards. It's a common job — and one that catches homeowners out because it sits awkwardly between the roofer, the electrician and the solar installer.
Here's how the process actually works in Australia, what drives the cost, and the decisions worth making before anyone climbs a ladder.
When a removal and reinstall is actually needed
Not every roof job requires the panels to come off. Work out which situation you're in first.
You'll almost certainly need a full removal if:
- The roof sheeting or tiles underneath the array are being replaced
- The roof is being repainted or restored (overspray on panels is a nightmare)
- Sarking or insulation under the array is being added or replaced
- You're adding a storey, a dormer, or significantly changing the roof structure
- Structural repairs are needed to rafters or battens the mounts are fixed to
You may be able to avoid it if:
- Only a section of roof away from the array is being worked on
- You're replacing a few broken tiles at the edge of the roof
- Gutter or fascia replacement doesn't disturb the mounting rails
A "lift and shift" is sometimes possible on tiled roofs, where panels are temporarily lifted in rows so the roofer can work beneath, then set back down. It's cheaper than a full removal but only works on smaller jobs and when the roofer and installer can co-ordinate closely on the same days.
If you're unsure, get your roofer to mark up which roof planes are affected and send that to a solar installer. They'll tell you quickly whether the array is in the way.
How the process works, step by step
A proper removal and reinstall is a two-visit job with the roof work sandwiched in between.
Before removal
A good installer will document the system first: panel and inverter serial numbers, string layout, which panels sit on which roof plane, and photos of the existing wiring and mounting. This matters more than people expect. If panels go back in a different order or a string gets rewired incorrectly, you can end up with mismatched strings and lower output that nobody notices for months.
The system is shut down properly — AC isolator, then DC isolators, in the correct sequence — before anything is unbolted.
Removal day
Panels come off, get labelled, and are stored flat and padded, usually face-down on timber or foam. Rails, feet and flashings come off next. On a tiled roof, the installer will often find a handful of cracked tiles under the mounts; that's normal and your roofer is replacing them anyway.
Cabling is either coiled and protected or removed entirely, depending on whether the conduit runs are being replaced. Roof penetrations get temporarily sealed if there's any gap between the roof work starting.
Storage
Panels are glass. Stored badly — leaning against a fence, stacked face to face without spacers, or left where a kid can knock them — they develop microcracks you won't see until output drops. Ask where they'll be stored and for how long. On-site storage in a garage is fine; a driveway for three weeks is not.
Reinstall
New mounting feet and flashings should be used, not the originals. Old feet have been weathered, bolted and unbolted, and the seals are compromised. Reusing them to save a small amount is false economy on a roof that's just been replaced.
The installer refits rails, remounts panels in the documented layout, re-runs or reconnects cabling, and recommissions the system. You should get a new set of compliance paperwork and an updated system record.
After reinstall
Check the monitoring app for a few clear days and compare output against what you were getting before. If a string is down, it's far easier to resolve in the first fortnight than six months later.
What affects the cost
Cost varies a lot by system size, roof type, access and location, so treat any single figure you read online with suspicion. These are the factors that actually move the price:
| Factor | Why it matters |
|---|---|
| Number of panels | Most quotes scale per panel for labour and handling |
| Roof type | Tin is quicker than tile; tile often means replacing cracked tiles |
| Roof pitch and height | Steep or two-storey roofs need more edge protection and scaffolding |
| Access | Narrow side access, trees or sloping blocks slow everything down |
| Storage duration | Longer gaps may mean off-site storage and extra handling |
| New mounting hardware | Fresh feet, flashings and sometimes rails |
| Electrical work | New conduit runs, isolator replacement, inverter relocation |
| Site-specific requirements | Scaffolding, traffic management, strata approvals |
Two other things frequently get bundled in without homeowners realising. First, if your system is older, the installer may flag that isolators, DC cabling or conduit no longer meet current standards and should be upgraded while everything is apart. That's usually a sensible call — the labour is already being paid for. Second, if any panels are damaged during removal or were already degraded, replacement costs sit on top.
Because the pricing depends so heavily on your roof and your array, the only reliable number is a quote from someone who has seen photos or visited the site.
The warranty and compliance traps
This is where most of the real risk sits.
Don't let the roofer do it. Roofers are not accredited to disconnect, reconnect or recommission a solar system, and unlicensed electrical work on a PV array is both dangerous and a likely insurance problem. DC strings carry lethal voltage even when the inverter is off. The removal and reinstall should be done by a licensed electrician, and the reinstall specifically by a SAA-accredited installer.
Check your installation warranty. Panel product warranties generally survive a reinstall, but your original installer's workmanship warranty on the mounting and waterproofing usually doesn't transfer to work done by someone else. The new installer should provide their own workmanship warranty on the reinstall. Ask for it in writing and check what period it covers.
Keep the serial numbers. If panels need to be claimed on warranty later, the manufacturer will want serials matched to the original installation records. Make sure the list survives the move.
Confirm the paperwork. Depending on your state and network, the reinstall may require a new Certificate of Electrical Safety or equivalent, and your distributor may need to be notified. Your installer handles this, but ask them to confirm it's been lodged.
STCs are not re-claimed. The small-scale technology certificates were created when the system was first installed. Taking panels off and putting the same panels back doesn't generate new ones. Only genuinely new capacity added to the system can be eligible, subject to the usual rules.
Is it worth upgrading at the same time?
If your system is eight to twelve years old, a reroof is the single best moment to reconsider it. The scaffolding is up, the roof is bare, the electrician is already on site, and you're paying for labour anyway.
Worth weighing up:
- Adding capacity. If your roof is being replaced, extra panels cost less to add now than as a separate job later. Check your inverter capacity and your network's export limit first.
- Replacing an ageing inverter. Inverters typically need replacing before panels do. If yours is nearing end of life, doing it during the reinstall avoids a second service call.
- Battery readiness. Even if you're not buying a battery now, running the right cabling and leaving space on the switchboard while the walls and roof are accessible makes a later install cheaper.
- Repositioning the array. Shading patterns change as trees grow and neighbours build. A reinstall is a free chance to re-plan the layout for better year-round output rather than putting panels back exactly where a previous installer chose.
In some cases — very old panels, a failing inverter, and a system that was undersized to begin with — a full replacement makes more sense than paying to remove and reinstall equipment that's near the end of its useful life. A good installer will tell you that honestly rather than just quoting the reinstall.
Getting the timing right
The single biggest source of frustration is scheduling. The roofer can't start until the panels are off; the installer can't come back until the roof is finished and sealed. Gaps cost money in storage and lost generation.
Book both trades at the same time, with the roofer's estimated finish date as the anchor, and build in a buffer for weather. Ask your roofer to call the installer directly once the roof is watertight rather than relaying messages through you. And if the forecast looks bad, delay the removal — a stripped roof plus loose panels in a storm is nobody's idea of a good week.
If your reroof is coming up, get a solar installer involved early. They'll tell you whether the array actually needs to come off, what the reinstall involves for your roof type, and whether upgrading at the same time stacks up. Get your free solar quote and we'll connect you with SAA-accredited installers who can price the removal, the reinstall, and any upgrades in one go.
Frequently asked questions
Can I leave the panels on and just paint around them?
Technically yes, but it's rarely a good outcome. You'll be left with unpainted roof under the array, overspray risk on the panels and frames, and a visible line if the panels are ever removed later. Most roof restorers won't warrant the work either.
How long will my system be off?
It depends entirely on the roof job. A straightforward tin reroof might take a few days; a tile replacement with structural repairs can run a couple of weeks. You'll lose generation for that period and pay full retail for all your electricity, which is worth factoring into your timing — winter outages cost less in lost output than summer ones.
Will removal damage my panels?
It can if handled badly. Glass panels are vulnerable to point loads, flexing and knocks, and the resulting microcracks often don't show up visually. Choosing an installer who labels, pads and stores panels properly is the main protection. It's also worth photographing the panels before and after as a record.
Do I need to tell my insurer or my electricity retailer?
Tell your insurer if the system will be off the roof for an extended period, as storage conditions can affect cover. Your retailer doesn't need notice for a temporary shutdown, but if the reinstall changes your system size or export arrangement, your installer will need to update the network and that can affect your feed-in arrangement. Confirm with your retailer once the system is back online.